The article gives detailed characteristics of elements of cost price of scientific and research and research and design works. The targeted aim is achieved due to determination of concepts ‘scientific and research work’, ‘cost price’. The authors determine the role of the main factor, which is the basis of cost price – coefficient of costs and give economical analysis of cost price of NDDKR.
Analysis of cost price of scientific and research and research and design works
published: 2019-08-14
Number: Issue 8(2008)
Section: Without a section
The page spacing of the article: 54-58
Keywords:
How to quote an article:
Natalya Gaevska, Vira Zaichenko Analysis of cost price of scientific and research and research and design works. Dorogi і mosti [Roads and bridges]. Kyiv, 2008. 8. P. 54-58 [in Ukrainian]
Authors
Summary
References
1. Постанова Кабінету Міністрів України від 20 липня 1996 р. № 830.
2. Наказ Державного комітету України з будівництва та архітектури №30 від 16.02.2004 року. Методичні рекомендації з формування собівартості будівельно-монтажних робіт
3. Наказ Державного комітету промислової політики України від 2 лютого 2001 року № 41. Методичні рекомендації з формування собівартості продукції (робіт, послуг).
4. Законом України “Про ціни і ціноутворення” від 3 грудня 1990 року № 507-12.
Archives
- 2023
- 2022
- 2021
- 2020
- 2019
- 2018
- 2017
- 2016
- 2015
- 2014
- 2011
- 2010
- 2009
- 2008
- 2022 Conference abstracts