Environmental impact assessment for construction and reconstruction of motor roads

published:
Number: Issue 26(2022)
Section: Environmental protection technologies
The page spacing of the article: 285–299
Keywords: road, construction, leopold matrix, environmental impact assessment, reconstruction
How to quote an article: Vadym Ziuziun, Tetiana Morozova, Anatolii Morozov. Environmental impact assessment for construction and reconstruction of motor roads. Dorogi і mosti [Roads and bridges]. Kyiv, 2022. Iss. 26. P. 285–299.

Authors

National Transport University, Kyiv, Ukraine
https://orcid.org/0000-0001-5596-6193
National Transport University, Kyiv, Ukraine
https://orcid.org/0000-0003-4836-1035
National Transport University (NTU), Kyiv, Ukraine
https://orcid.org/0000-0001-6566-8798

Summary

Introduction. Environmental impact assessment is an important legal instrument that is aimed at preventing / minimizing environmental damage, ensuring environmental safety, rational use of natural resources, in the decision-making process on the implementation of economic activities. EIA is an important legal tool to prevent the consequences of activities of both enterprises and planned activities. This tool is as close as possible to European Union standards. EIA is carried out in compliance with the requirements of the legislation on environmental protection, taking into account the existing ecological state, environmental risks of the planned activity, prospects for socio-economic development, the power of the combined direct and indirect impact, including taking into account existing facilities.

An EIA is a procedure preceding a planned economic activity (in this case, the construction or reconstruction of roads) and involves determining the nature, degree of danger of this activity on the environment and public health

Problem Statement. Projects for the construction and reconstruction of roads are an integral part of Ukraine. Transport infrastructure has a significant negative impact on the environment, which is accompanied by the transformation of ecosystems, fragmentation of landscapes. In addition, motor vehicles are a powerful source of pollution of the atmosphere, territories and water areas adjacent to roads, and noise pollution. However, do not ignore the economic importance of road communication. That is why, the planning, construction and operation of roads must be carried out in accordance with environmental standards, and the norms themselves must ensure minimization of environmental impact.

So far, there are no clear practical recommendatory criteria for determining the environmental damage of the proposed activity and the preparation of the EIA report. That is why it is important to constantly improve existing methods and definitions of environmental risks in order to form an assessment mechanism. This study is devoted to the application of one of such modern mechanisms of environmental impact assessment. The use of the method for assessing the level of environmental hazards for the implementation of the planned activities in the construction and reconstruction of critical infrastructure facilities was tested.

Purpose. To test the method of assessing the level of environmental impact in the implementation of planned activities in the construction and reconstruction of the highway.

Research methods. general scientific (generalization, comparison, analysis and synthesis, theoretical and methodological substantiation); mathematical statistics

Results. To quantify the interaction between the types of activities (or groups of acting factors) during the project and the components (environmental characteristics) of the environment, a combined approach was taken to assess the impact using the improved Leopold matrix. The matrix is a table that contains horizontally a list of processes that affect the environment during the reconstruction (repair) of the road, vertically — criteria and indicators of impact, as environmental characteristics. The evaluator (analyst, project developer, expert) can modify the matrix in accordance with the specific tasks of the road construction and reconstruction (repair) project.

Conclusion. The generalized function allows you to set an integral indicator of environmental impact assessment, which is a quantitative, unambiguous, universal indicator of the quality of the studied object and can be used as an EIA criterion for the construction and reconstruction (repair) of a road through its adequacy, efficiency and statistical sensitivity.

 

References

  1. Pro ocinku vplyvu na dovkillya: Law of Ukraine of 23.05.2017 N 2059- VIII, editorial office of 13.05.2022 N 1822-IX // Database of Legislation of Ukraine / Verkhovna Rada of Ukraine. URL: https://zakon.rada.gov.ua/laws/show/2059-19#Text (Last accessed: 08.07.2022).
  2. Uhoda pro Asotsiatsiiu mizh Ukrainoiu, z odniiei storony, ta Yevropeiskym Soiuzom, Yevropeiskym spivtovarystvom z atomnoi enerhii i yikhnimy derzhavamy-chlenamy, z inshoi storony. URL: https://zakon.rada.gov.ua/laws/show/984_011 (Last accessed: 08.07.2022).
  3. DBN A.2.2-1-2003 Proektuvannia. Sklad i zmist materialiv otsinky vplyviv na navkolyshnie seredovyshche (OVNS) pry proektuvanni i budivnytstvi pidpryiemstv, budynkiv i sporud [State Building Norms (DBN A.2.2-1-2003) Designing. The composition and content of environmental impact assessment materials (EIA) in the design and construction of enterprises, buildings and structures]. URL: https://dbn.co.ua/load/normativy/dbn/1-1-0-242 (Information and documentation) (Last accessed: 08.07.2022) [in Ukrainian].
  4. Savenko V. Ya., Mudrychenko A.Ya. Udoskonalennia tekhnolohii budivnytstva asfaltobetonnykh shariv z vykorystanniam teplykh sumishei [Improvement of the technology of construction of asphalt concrete layers using warm mixtures]. Avtomobilni dorohy i dorozhnie budivnytstvo. 2017. 99. P. 90–97 [in Ukrainian].
  5. Slavinska O. S., Usychenko O. Yu. Systema upravlinnia yakistiu v tekhnolohichnykh protsesakh budivnytstva zemlianoho polotna avtomobilnykh dorih [The quality management system in the technological processes of construction of road surface]. Avtomobilni dorohy i dorozhnie budivnytstvo. 2017. 100. P. 3–10 [in Ukrainian].
  6. Zhdanyuk V.K., Volovyk O.O., Bizhan O.P., Cyrkunova K.V., Gnatenko R.G. Shchodo konstruktyvno-tekhnolohichnykh osoblyvostei hermetyzatsii trishchyn v asfaltobetonnykh pokryttiakh [Regarding the structural and technological features of sealing cracks in asphalt concrete pavements]. Vestnik Harʹkovskogo nacionalʹnogo avtomobilʹno-dorožnogo universiteta. 2019. 84. P. 82–87 [in Ukrainian].
  7. Kiyashko I. V. Porivnialnyi analiz vitchyznianykh ta mizhnarodnykh norm na proektuvannia avtomobilnykh dorih [Comparative analysis of domestic and international standards for highway design]. Materialy Vseukrainskoi naukovo-praktychnoi Internet-konferentsii «Budivnytstvo ta ekspluatatsiia obiektiv transportnoi infrastruktury». Xarkiv: XNADU, 2018 P. 18–27 [in Ukrainian].
  8. Sydor V. Otsinka vplyvu na dovkillia: zakon pratsiuie, problemy zalyshaiutsia [Environmental impact assessment: the law works, problems remain]. Ekologichne pravo. 2018. 6. P. 142–146 [in Ukrainian].
  9. Sharavara V. V., Bondarenko O.O., Tarasova O.H., Havryliuk R.B., Hulevets D.V., Savchenko S.A. Vprovadzhennia otsinky vplyvu na dovkillia v Ukraini: analiz ryzykiv i perspektyv (hromadske bachennia) [Implementation of environmental impact assessment in Ukraine: analysis of risks and prospects (public vision)]. Kyiv: NECzU, 2019. 29 p. [in Ukrainian].
  10. Barna I.M. OVD yak mekhanizm zabezpechennia ekolohichnoi bezpeky [OVD as a mechanism for ensuring environmental safety]. Naukovi zapysky. – 2019.  1. P. 215–224. DOI: doi.org/10.25128/2519-4577.19.2.27 [in Ukrainian].
  11. Zub L.M., Kostiushyn V.A., Khrutba V.O., Lievina H.M., Sumskyi Ye.D., Pylypovych O.V., Kostiushyn Ye.V., Matus S.A., Yamelynets T.S., Halaiko M.B. Pidgotovka zvitu z ocinky vplyvu na dovkillya pry budivnycztvi ta rekonstrukciyi avtodorig [Preparation of the environmental impact assessment report for the construction and reconstruction of highways] : metodychnyj posibnyk. Kyiv, 2019. 108 p. [in Ukrainian].
  12. Leopold  L.B., Clarke F.E., Hanshaw B.B. and others.  A procedure for evoluting environmental impact. Washington, 1971. 13 p. [in English].
  13. Rudenko S.V., Olekh T.M., Hohunskyi V.D. Model obobshhennoj ocenky vozdejstvyya na okruzhayushhuyu sredu v proektax [Generalized environmental impact assessment model for projects]. Upravlinnya rozvytkom skladnyx system. 2013. 15. P. 53–60 [in Russian].
  14. Olekh T.M., Kolesnykova E.V., Rudenko S.V Ekologicheskaya ocenka proektov [Environmental assessment of projects]. Praci Odeskogo politexnichnogo universytetu. 2013. Iss. 2 (41). P. 276–282 [in Russian].
  15. Khrutba V.O., Ziuziun V.I., Nieviedrov D.S. Literaturnyi pysmovyi tvir naukovoho kharakteru «Metod otsiniuvannia rivnia tekhnohennykh ta pryrodnykh nebezpek v proektakh budivnytstva ta rekonstruktsii obiektiv krytychnoi infrastruktury» [Literary written work of a scientific nature «Method of assessing the level of man-made and natural hazards in projects of construction and reconstruction of critical infrastructure objects»]. Certificate of copyright registration for the work No. 96545 dated 03/06/2020 [in Ukrainian].
  16. Khrutba V.O., Zyuzyun V.I., Barabash O.V., Spasichenko O.V., Nevyedrov D.S. Literaturnyi pysmovyi tvir naukovoho kharakteru «Systema kryteriiv otsinky vplyvu na dovkillia v proektakh budivnytstva ta rekonstruktsii obiektiv krytychnoi infrastruktury» [Literary written work of a scientific nature «System of criteria for assessing the impact on the environment in projects of construction and reconstruction of critical infrastructure objects»]. Certificate of copyright registration for the work No. 96544 dated 03/06/2020 [in Ukrainian].
  17. Zvit z ocinky vplyvu na dovkillya «Rekonstrukciya avtomobilnoyi dorogy derzhavnogo znachennya N-31 Dnipro-Czary`chanka – Kobelyaky – Reshetylivka na dilyanci km 119+700 – km 124+800, Poltavska oblast» [Environmental impact assessment report «Reconstruction of the state highway N-31 Dnipro-Tsarychanka – Kobelyaki – Reshetylivka on the section km 119+700 – km 124+800, Poltava Region»]. UKRAVTODOR. Kyiv, 2019. 221 p. [in Ukrainian].