Review of recent developments on improvement of estimated regulatory documentation for road works

published:
Number: Issue 23(2021)
Section: Economy. Management
The page spacing of the article: 31–42
Keywords: public road, operational maintenance, investment documentation, overhaul and current repairs, machine, mechanism, regulatory document, resource element estimate norm, Standard of Organization of Ukraine
How to quote an article: Аnatolii Tsynka, Ivan Rakovich, Andrii Hrinchuk Review of recent developments on improvement of estimated regulatory documentation for road works. Dorogi і mosti [Roads and bridges]. 2021. Iss. 23. P. 31–42 [in Ukrainian].

Authors

M.P. Shulgin State Road Research Institute State Enterprise ‒ DerzhdorNDI SE, Kyiv, Ukraine
https://orcid.org/0000-0002-0357-2325
M.P. Shulgin State Road Research Institute State Enterprise – DerzhdorNDI SE, Kyiv, Ukraine
https://orcid.org/0000-0001-8581-5476
M.P. Shulgin State Road Research Institute State Enterprise ‒ DerzhdorNDI SE, Kyiv, Ukraine
https://orcid.org/0000-0001-7083-9862

Summary

Introduction. In the modern conditions of the pricing system in the construction of Ukraine, the key value have the estimated norms, which are presented in separate collections, the main purpose of which is to determine the standard quantity of resources required to perform a particular type of work as a basis for the transition to the cost indicators. In order to determine the cost of road work objectively and accurately, it is essential that the indicators of estimated norms meet the requirements of regulatory documents and modern methods of execution of road works.

Problematics. In connection with the active improvement of the regulatory base of the road construction industry, permanent upgrade of road organizations technique fleet, the introduction of new technologies and materials in construction and operation of roads, improving the methods of work there is a discrepancy between the existing resource element of estimated norms and the actual conditions of work in terms of built-up labor costs, the operation time of machines and mechanisms and the range of materials. Accordingly, it affects the reliability and accuracy of determining the cost of road works.

Purpose. Improvement and harmonization with actual working conditions and requirements of regulatory documents of industry regulatory and estimate base of resource elementary estimated norms for work performed during construction, reconstruction, repair and operational maintenance of roads and bridges to ensure reliable and valid technical, economic and estimated calculations.

Materials and methods. During work performance the analysis of the regulatory documentation, establishing the requirements to the technology of road works and materials has been carried out. A number of chronometric observations with the measurement of time of road works in full-scale conditions was carried out. The obtained data were summarized, averaged and on their basis the indicators of the resource element of the estimated norms were estimated.

Results. A review of the main amendments and additions, which came into force after the approval of Amendment № 2 SOU 42.1-37641918-035:2018 [1] and Amendment № 2
SOU 42.1-37641918-071:2018 [2], which were developed to improve the regulatory-estimate base for the calculation of road works, taking into account the requirements and provisions of existing regulatory documents taking into account the current state of scientific and technological progress in the road sector.

Conclusions. The above analysis of the amendments that came into force with the approval of [1]. and [2] will systematize the innovations provided by the requirements of current regulatory documents on the calculation of the cost of road works and the development of relevant documents at all stages of the investment process, planning and organization of road works, as well as the writing-off of material resources. Review and systematization of recent improvements in the estimated regulatory documents for road works will provide an opportunity to optimally plan the use of available material, labor and financial resources, often limited.

References

  1. SOU 42.1-37641918-035:2018 Avtomobilni dorohy. Resursni elementni koshtorysni normy na remontno-budivelni roboty. Zmina № 2 [Standard of organization of Ukraine (SOU 42.1‑37641918‑035:2018) Highways. Resource element estimates for repair and construction work. Amendment № 2]. Kyiv, 2020. 23 p. (Information and documentation) [in Ukrainian].
  2. SOU 42.1-37641918-071:2018 Avtomobilni dorohy. Resursni elementni koshtorysni normy na roboty z ekspluatatsiinoho utrymannia. Zmina № 2 [Standard of organization of Ukraine (SOU 42.1‑37641918-071:2018) Highways. Resource element estimates for maintenance work. Amendment № 2]. Kyiv, 2020. 15 p. (Information and documentation) [in Ukrainian].
  3. Kudenko M.Iu., Osypenko S.M., Pasichnyi V.O. Informatsiino-metodychne zabezpechennia pidhotovky investorskoi koshtorysnoi dokumentatsii [Information and methodological support for the preparation of investor budget documentation]. Kommunalnoe khoziaistvo horodov. Kharkiv, 2004. P. 155–161 [in Ukrainian].
  4. Kovtun-Horbachova T.A, Halych Ye.H., Bychkova T.P. Perevirka y analiz koshtorysnoi dokumentatsii na vsikh etapakh investytsiinoho tsyklu [Verification and analysis of budget documentation at all stages of the investment cycle]. Visnyk Prydniprovskoi derzhavnoi akademii budivnytstva ta arkhitektury. № 3 (253-254). Dnipropetrovsk, 2019. P. 36–41 [in Ukrainian].
  5. Kharchenko I.V. Shchodo obgruntuvannia rozrakhunkiv vytrat na ekspluatatsiiu budivelnykh mashyn pry vyznachenni koshtorysnoi vartosti budivnytstva [Regarding the substantiation of calculations of costs for operation of construction machines in determining the estimated cost of construction]. Naukovi zapysky. Iss. 10, part III. Kyiv, 2010. P. 147–151 [in Ukrainian].
  6. Bezuhlyi A.O, Bibyk Yu.M. Pryntsypy vdoskonalennia systemy tsinoutvorennia dorozhnikh robit [Principles of pricing system perfection of road-works]. Dorohy i mosty. Kyiv, 2011. Iss. 13. P. 14–17 [in Ukrainian].
  7. Bezuhlyi A.O., Tsynka A.O., Illiash S.I. Novi vidomchi koshtorysni normatyvy na roboty z kapitalnoho ta potochnoho remontiv avtomobilnykh dorih i mostiv [New departmental budget standards for capital and current repairs of roads and bridges]. Dorozhnia haluz Ukrainy. Kyiv, 2011. Iss. 3. P. 60–63 [in Ukrainian].
  8. Bezuhlyi A.O., Illiash S.I., Tsynka A.O. Novi vidomchi koshtorysni normatyvy na roboty z ekspluatatsiinoho utrymannia avtomobilnykh dorih i mostiv [New departmental estimates for maintenance of roads and bridges]. Dorozhnia haluz Ukrainy. Kyiv, 2011. Iss. 5. P. 78–80 [in Ukrainian].
  9. Bezuhlyi A.O., Illiash S.I., Tymoshchuk O.Iu. Udoskonalennia normatyvno-koshtorysnoi bazy budivnytstva dorih [Improving the regulatory framework for road construction]. Dorozhnia haluz Ukrainy. Kyiv, 2016. P. 39–41 [in Ukrainian].
  10. Proekt BUDSTANDART Online. Normatyvne rehuliuvannia.
  11. URL: http://online.budstandart.com/ua/news/normativnoe-regulirovanie-ua.html (Last accessed: 30.12.2020) [in Ukrainian].
  12. Suchasnyi park tekhniky i peredovi tekhnolohii u vyrobnytstvi asfaltobetonu «RDS Group». URL: https://rds.org.ua/ua/equipment (Last accessed: 22.12.2020) [in Ukrainian].
  13. «Avtomahistral-Pivden» prodovzhuie naroshchuvaty park tekhniky.
  14. URL: http://automagistral.com.ua/news/avtomagistral-pivden-prodovzhuie-naroshhuvati-park-tehniki/ (Last accessed: 22.12.2020) [in Ukrainian].
  15. Stroytelnaia tekhnyka «ONUR Group».
  16. URL: https://www.onurgroup.com/RU/r%D1%81%D1%83%D1%80%D1%81%D1%8B/%D0%A1%D1%82%D1%80%D0%BE%D0%B8%D1%82%D0%B5%D0%BB%D1%8C%D0%BD%D0%B0%D1%8F%D1%82%D0%B5%D1%85%D0%BD%D0%B8%D0%BA%D0%B0/ (Last accessed: 22.12.2020) [in Russian].
  17. SOU 42.1-37641918-035:2018 Avtomobilni dorohy. Resursni elementni koshtorysni normy na remontno-budivelni roboty [Standard of organization of Ukraine (SOU 42.1-37641918-035:2018) Highways. Resource element estimates for repair and construction work]. Kyiv, 2018. 362 p. (Information and documentation) [in Ukrainian].
  18. SOU 42.1-37641918-071:2018 Avtomobilni dorohy. Resursni elementni koshtorysni normy na roboty z ekspluatatsiinoho utrymannia [Standard of organization of Ukraine (SOU  42.1‑37641918‑071:2018) Highways. Resource element estimates for maintenance work]. Kyiv, 2018. 300 p. (Information and documentation) [in Ukrainian].
  19. DSTU-N B D.1.1-6:2013 Nastanova shchodo rozroblennia resursnykh elementnykh koshtorysnykh norm na budivelni roboty [State Standard of Ukraine (DSTU-N B D.1.1-6:2013) Guidance on developing resource element estimated standards for construction work]. Kyiv, 2013. 41 p. (Information and documentation) [in Ukrainian].
  20. DBN V.2.3-4:2015 Avtomobilni dorohy. Chastyna I. Proektuvannia. Chastyna II. Budivnytstvo [State Building Norms (DBN V.2.3-4:2015) Highways. Part I. Design. Part II. Building]. Kyiv, 2016. 104 p. (Information and documentation) [in Ukrainian].
  21. DBN V.2.3-4:2015 Avtomobilni dorohy. Chastyna I. Proektuvannia. Chastyna II. Budivnytstvo. Zmina № 1 [State Building Norms (DBN V.2.3-4:2015) Avtomobilni dorohy. Chastyna I. Proektuvannia. Chastyna II. Budivnytstvo. Amendment № 1]. Kyiv, 2019. 27 p. (Information and documentation) [in Ukrainian].
  22. SOU 42.1-37641918-102:2013 Vyrobnychi normy vytrat materialiv na budivnytstvo, remonty i ekspluatatsiine utrymannia avtomobilnykh dorih i mostiv [Standard of organization of Ukraine (SOU 42.1-37641918-102:2013) Production standards for the cost of materials for construction, repair and maintenance of roads and bridges]. Kyiv, 2013. 87 p. (Information and documentation) [in Ukrainian].
  23. DSTU 4044:2019 Bitumy naftovi dorozhni viazki. Tekhnichni umovy [State Standard of Ukraine (DSTU 4044:2019) Viscous petroleum road bitumens. Specification]. Kyiv, 2019. 11 p. (Information and documentation) [in Ukrainian].
  24. SOU 42.1-37641918-098:2017 Avtomobilni dorohy. Normy chasu na remontno-budivelni roboty [Standard of organization of Ukraine (SOU 42.1-37641918-098:2017) Highways. Time norms for repair and construction works]. Kyiv, 2017. 210 p. (Information and documentation) [in Ukrainian].
  25. DSTU B D.2.2-27:2016 Resursni elementni koshtorysni normy na budivelni roboty. Avtomobilni dorohy (Zbirnyk 27) [State Standard of Ukraine (DSTU B D.2.2-27:2016) Resource element budget norms for building works roads (Collection 27)]. Kyiv, 2016. 81 p. (Information and documentation) [in Ukrainian].
  26. DSTU B V.2.7-136:2016 Materialy dlia hermetyzatsii shviv i trishchyn v pokryttiakh dorozhnoho odiahu avtomobilnykh dorih. Zahalni tekhnichni vymohy [State Standard of Ukraine (DSTU B V.2.7-136:2016) Materials for joints and cracks sealing in the pavements of automobile roads. General specifications]. Kyiv, 2017. 12 p. (Information and documentation) [in Ukrainian].
  27. DSTU-N B V.3.2-5:2016 Nastanova z likvidatsii vyboin pokryttia nezhorstkoho dorozhnoho odiahu avtomobilnykh dorih  [State Standard of Ukraine (DSTU-N B V.3.2-5:2016) Guidelines on the elimination of potholes on the nonrigid pavement]. Kyiv, 2016. 18 p. (Information and documentation) [in Ukrainian].
  28. SOU 42.1-37641918-097:2017 Avtomobilni dorohy. Normy chasu na roboty z ekspluatatsiinoho utrymannia. Zmina № 1 [Standard of organization of Ukraine (SOU 42.1-37641918‑097:2017) Highways. Time norms for maintenance work. Amedment № 1].  Kyiv, 2020. 9 p. (Information and documentation) [in Ukrainian].
  29. SOU 42.1-37641918-034:2018 Dorozhni mashyny ta mekhanizmy. Resursni koshtorysni normy ekspluatatsii budivelnykh mashyn ta mekhanizmiv [Standard of organization of Ukraine (SOU 42.1-37641918-034:2018) Road machines and mechanisms. Resource estimated norms of operation of construction machines and mechanisms]. Kyiv, 2018. 39 p. (Information and documentation) [in Ukrainian].
  30. SOU 42.1-37641918-082:2018 Dorozhni mashyny ta mekhanizmy. Resursni koshtorysni normy ekspluatatsii mashyn ta mekhanizmiv dlia ekspluatatsiinoho utrymannia [Standard of organization of Ukraine (SOU 42.1-37641918-082:2018) Road machines and mechanisms. Resource estimated norms of operation of machines and mechanisms for operational maintenance]. Kyiv, 2018. 21 p. (Information and documentation) [in Ukrainian].